Steel Mill Tracker › Steel mills by country
Which steel mills in Spain are running?
12 of the 13 steel mills we track in Spain showed furnace heat on their latest satellite passes as of Nov 22, 2026, and 1 reads as paused.
- Mills tracked
- 13
- Running
- 12
- Below their normal level
- 1
- Paused
- 1
- No reading
- 0
- Capacity at running mills
- 22.2 Mt
Every steel mill in Spain
| Mill | Capacity a year | Status |
|---|---|---|
| ArcelorMittal Asturias (Gijón)ArcelorMittal España SA | 5.9 Mt | Running |
| ArcelorMittal Asturias (Aviles)ArcelorMittal España SA | 4.2 Mt | On and off |
| Celsa Barcelona CastellbisbalCompania Espanola de Laminacion SL | 2.5 Mt | Running |
| ArcelorMittal SestaoArcelormittal Sestao SL | 2 Mt | On and off |
| ArcelorMittal Olaberria-Bergara (Olaberria)Arcelormittal Olaberria-Bergara SL | 1.4 Mt | Running |
| Grupo Gallardo Siderurgica Balboa Jerez de los CaballerosAG Siderurgica Balboa SA | 1.3 Mt | Running at low volume |
| Riva Siderurgica SevillanaSiderurgica Sevillana SA | 1.3 Mt | Paused since Sep 14 |
| Acerinox Europa Los BarriosAcerinox Europa SAU | 1.2 Mt | Restarted Nov 6 |
| Celsa NervaceroNervacero SA | 1 Mt | Running |
| Celsa Global Steel Wire SantanderGlobal Steel Wire SA | 750 kt | Running |
| Sidenor Aceros Especiales BasauriSidenor Aceros Especiales SLU | 740 kt | Running |
| Megasa Siderúrgica NarónMegasa Siderurgica SL | 700 kt | Running at low volume |
| Megasider ZaragozaMegasider Zaragoza SA | 500 kt | Running at low volume |
Largest first. Status is the reading from the latest clear satellite passes; open a mill for its year of passes.
Common questions
Which steel mills in Spain are running?
12 of the 13 steel mills we track in Spain showed furnace heat on their latest satellite passes as of Nov 22, 2026, and 1 reads as paused. The running mills hold 22.2 Mt of the 23.5 Mt a year of capacity on the list.
Which steel mills in Spain are paused right now?
Riva Siderurgica Sevillana: no furnace heat on their latest clear passes as of Nov 22, 2026.
Which steel mills in Spain are producing below normal?
ArcelorMittal Sestao: still hot, but hot on fewer clear passes over the last 90 days than over their past year, as of Nov 22, 2026.
How many steel mills are there in Spain?
Global Energy Monitor lists 13 operating steel plants in Spain that make iron or crude steel, with 23.5 Mt a year of capacity. The largest is ArcelorMittal Asturias (Gijón) (5.9 Mt a year).
Read from shortwave-infrared passes of Sentinel-2 and Landsat 8 and 9 (a pass is hot at 3 or more hot spots inside 3 km of the plant) and NASA VIIRS. Sources: Global Energy Monitor (CC BY 4.0), Copernicus Sentinel-2, USGS Landsat, NASA FIRMS. Method in full: How can you tell if a steel mill is running?
Know a mill we're missing? Check its address on the map.