Steel Mill Tracker › Steel mills in Spain
Is Celsa Barcelona Castellbisbal producing at its normal level?
Yes. Celsa Barcelona Castellbisbal is at its usual level: it was hot on 6 in 10 clear passes over the last 90 days, against 7 in 10 over the past year.
- Status
- Running
- Latest clear pass
- Nov 17, 2026 0 hot spots
- Last furnace heat
- Oct 31, 2026
- Hot passes, past year
- 61 of 91
- Usual heat when hot
- 7 hot spots
- Daily sensor, last 7 days
- Seen on 3 of 7
- Capacity
- 2.5 Mt a year
- Owner
- Compania Espanola de Laminacion SL
Each red bar is a clear pass with furnace heat; its height is the number of hot spots (top of the chart: 32). Each grey tick is a clear pass with none. Cloudy days have no mark.
See Celsa Barcelona Castellbisbal on the map, with the satellite picture of each pass
Email me updates about this mill.
Common questions
Is Celsa Barcelona Castellbisbal producing at its normal level?
Yes. Celsa Barcelona Castellbisbal is at its usual level: it was hot on 6 in 10 clear passes over the last 90 days, against 7 in 10 over the past year. The latest clear pass, on Nov 17, 2026, showed 0 hot spots. Heat on 3 of the last 7 days, from the daily sensor. Latest clear pass Nov 17.
Is Celsa Barcelona Castellbisbal running?
Most likely yes. Celsa Barcelona Castellbisbal showed furnace heat on its recent passes, though the latest clear pass, on Nov 17, 2026, was cold. Heat on 3 of the last 7 days, from the daily sensor. Latest clear pass Nov 17. One cold pass after heat is usually a gap between heats; the tracker calls a pause only after two in a row.
When was Celsa Barcelona Castellbisbal last hot?
Its latest clear pass with furnace heat was on Oct 31, 2026, with 12 hot spots. Over the past year it was hot on 61 of 91 clear passes.
Who owns Celsa Barcelona Castellbisbal and how big is it?
Celsa Barcelona Castellbisbal is in Spain. Its owner is Compania Espanola de Laminacion SL. It can make about 2.5 Mt of steel a year, according to Global Energy Monitor.
Read from shortwave-infrared passes of Sentinel-2 and Landsat 8 and 9 (a pass is hot at 3 or more hot spots inside 3 km of the plant) and NASA VIIRS. Sources: Global Energy Monitor (CC BY 4.0), Copernicus Sentinel-2, USGS Landsat, NASA FIRMS. Method in full: How can you tell if a steel mill is running?
Nearest steel mills in Spain
- Megasider Zaragoza 237 km away · Running at low volume
- ArcelorMittal Olaberria-Bergara (Olaberria) 388 km away · Running
- Sidenor Aceros Especiales Basauri 446 km away · Running
- ArcelorMittal Sestao 458 km away · On and off
- Celsa Nervacero 460 km away · Running
- Celsa Global Steel Wire Santander 526 km away · Running
- ArcelorMittal Asturias (Gijón) 673 km away · Running
- ArcelorMittal Asturias (Aviles) 684 km away · On and off
All steel mills in Spain · Every country
Wrong mill, place or owner? Tell us and we fix it.