Steel Mill Tracker › Steel mills in Spain
Is Megasa Siderúrgica Narón producing at its normal level?
Yes, for this mill. Megasa Siderúrgica Narón normally runs at low volume, with furnace heat on 4 of 51 clear passes in the past year, and on 2 in 10 clear passes lately.
- Status
- Running at low volume
- Latest clear pass
- Nov 6, 2026 2 hot spots
- Last furnace heat
- Sep 20, 2026
- Hot passes, past year
- 4 of 51
- Usual heat when hot
- –
- Daily sensor, last 7 days
- –
- Capacity
- 700 kt a year
- Owner
- Megasa Siderurgica SL
Each red bar is a clear pass with furnace heat; its height is the number of hot spots (top of the chart: 8). Each grey tick is a clear pass with none. Cloudy days have no mark.
See Megasa Siderúrgica Narón on the map, with the satellite picture of each pass
Email me updates about this mill.
Common questions
Is Megasa Siderúrgica Narón producing at its normal level?
Yes, for this mill. Megasa Siderúrgica Narón normally runs at low volume, with furnace heat on 4 of 51 clear passes in the past year, and on 2 in 10 clear passes lately. The latest clear pass, on Nov 6, 2026, showed 2 hot spots. Heat on 4 of 51 clear passes in the past year, so a cold pass is normal for this mill.
Is Megasa Siderúrgica Narón running?
Yes, at low volume. Megasa Siderúrgica Narón shows furnace heat on some passes and not others: hot on 4 of 51 clear passes in the past year. Heat on 4 of 51 clear passes in the past year, so a cold pass is normal for this mill.
When was Megasa Siderúrgica Narón last hot?
Its latest clear pass with furnace heat was on Sep 20, 2026, with 4 hot spots. Over the past year it was hot on 4 of 51 clear passes.
Who owns Megasa Siderúrgica Narón and how big is it?
Megasa Siderúrgica Narón is in Spain. Its owner is Megasa Siderurgica SL. It can make about 700 kt of steel a year, according to Global Energy Monitor.
Read from shortwave-infrared passes of Sentinel-2 and Landsat 8 and 9 (a pass is hot at 3 or more hot spots inside 3 km of the plant) and NASA VIIRS. Sources: Global Energy Monitor (CC BY 4.0), Copernicus Sentinel-2, USGS Landsat, NASA FIRMS. Method in full: How can you tell if a steel mill is running?
Nearest steel mills in Spain
- ArcelorMittal Asturias (Aviles) 185 km away · On and off
- ArcelorMittal Asturias (Gijón) 196 km away · Running
- Celsa Global Steel Wire Santander 349 km away · Running
- Celsa Nervacero 416 km away · Running
- ArcelorMittal Sestao 418 km away · On and off
- Sidenor Aceros Especiales Basauri 428 km away · Running
- ArcelorMittal Olaberria-Bergara (Olaberria) 484 km away · Running
- Grupo Gallardo Siderurgica Balboa Jerez de los Caballeros 589 km away · Running at low volume
All steel mills in Spain · Every country
Wrong mill, place or owner? Tell us and we fix it.