Steel Mill Tracker › Steel mills by country
Which steel mills in Brazil are running?
19 of the 22 steel mills we track in Brazil showed furnace heat on their latest satellite passes as of Nov 22, 2026, and 1 reads as paused.
- Mills tracked
- 22
- Running
- 19
- Below their normal level
- 2
- Paused
- 1
- No reading
- 2
- Capacity at running mills
- 71.7 Mt
Every steel mill in Brazil
| Mill | Capacity a year | Status |
|---|---|---|
| ArcelorMittal TubarãoArcelorMittal Tubarão Comercial SA | 14.8 Mt | Running |
| CSN Volta RedondaCompanhia Siderúrgica Nacional SA | 11.8 Mt | Running |
| Ternium Brasil Santa CruzTernium Brasil Ltda | 10.5 Mt | Running |
| Usiminas IpatingaUsinas Siderurgicas de Minas Gerais SA | 8.7 Mt | Running |
| Gerdau Açominas Ouro BrancoGerdau Acominas SA | 7.9 Mt | Running |
| ArcelorMittal PecémArcelorMittal Brasil SA | 6.2 Mt | Running |
| ArcelorMittal MonlevadeArcelorMittal Brasil SA | 2.2 Mt | No clear pass since Oct 9 |
| Aperam TimóteoAperam Inox America do Sul SA | 1.6 Mt | No clear pass since Oct 9 |
| ArcelorMittal Juiz de ForaArcelorMittal Brasil SA | 1.5 Mt | Running |
| Vallourec JeceabaVallourec Soluções Tubulares do Brasil SA | 1.4 Mt | Running |
| AVB AçailândiaAço Verde do Brasil SA | 1.3 Mt | On and off |
| ArcelorMittal PiracicabaArcelorMittal Brasil SA | 1.1 Mt | Running |
| Gerdau DivinópolisGerdau Acos Longos SA | 1 Mt | Paused since Oct 12 |
| ArcelorMittal ResendeArcelorMittal Brasil SA | 1 Mt | Running |
| Gerdau São Paulo AraçariguamaGerdau Acos Longos SA | 950 kt | Running |
| Gerdau Cosigua Santa CruzGerdau Acos Longos SA | 936 kt | Running |
| ArcelorMittal Barra MansaArcelorMittal Brasil SA | 800 kt | Running at low volume |
| Sinobras MarabáSiderurgica Norte Brasil SA | 679 kt | Running |
| Simec CariacicaGV do Brasil Industria e Comercio de Aço Ltda | 600 kt | Running |
| Gerdau PindamonhangabaGerdau SA | 530 kt | Running |
| Simec PindamonhangabaGV do Brasil Industria e Comercio de Aço Ltda | 500 kt | Running |
| Viena AçailândiaAndrade Valladares Engenharia e Construcao Ltda | 500 kt | Running at low volume |
Largest first. Status is the reading from the latest clear satellite passes; open a mill for its year of passes.
Common questions
Which steel mills in Brazil are running?
19 of the 22 steel mills we track in Brazil showed furnace heat on their latest satellite passes as of Nov 22, 2026, and 1 reads as paused. 2 more had no reading we could use (cloud, or no heat ever seen from orbit). The running mills hold 71.7 Mt of the 76.6 Mt a year of capacity on the list.
Which steel mills in Brazil are paused right now?
Gerdau Divinópolis: no furnace heat on their latest clear passes as of Nov 22, 2026.
Which steel mills in Brazil are producing below normal?
ArcelorMittal Barra Mansa, Sinobras Marabá: still hot, but hot on fewer clear passes over the last 90 days than over their past year, as of Nov 22, 2026.
How many steel mills are there in Brazil?
Global Energy Monitor lists 22 operating steel plants in Brazil that make iron or crude steel, with 76.6 Mt a year of capacity. The largest is ArcelorMittal Tubarão (14.8 Mt a year).
Read from shortwave-infrared passes of Sentinel-2 and Landsat 8 and 9 (a pass is hot at 3 or more hot spots inside 3 km of the plant) and NASA VIIRS. Sources: Global Energy Monitor (CC BY 4.0), Copernicus Sentinel-2, USGS Landsat, NASA FIRMS. Method in full: How can you tell if a steel mill is running?
Know a mill we're missing? Check its address on the map.