Steel Mill Tracker › Steel mills by country
Which steel mills in Austria are running?
2 of the 2 steel mills we track in Austria showed furnace heat on their latest satellite passes as of Nov 22, 2026, and none reads as paused.
- Mills tracked
- 2
- Running
- 2
- Below their normal level
- 0
- Paused
- 0
- No reading
- 0
- Capacity at running mills
- 14.2 Mt
Every steel mill in Austria
| Mill | Capacity a year | Status |
|---|---|---|
| Voestalpine Stahl LinzVoestalpine Stahl GmbH | 11 Mt | Running |
| Voestalpine Stahl DonawitzVoestalpine Stahl Donawitz GmbH | 3.2 Mt | Running |
Largest first. Status is the reading from the latest clear satellite passes; open a mill for its year of passes.
Common questions
Which steel mills in Austria are running?
2 of the 2 steel mills we track in Austria showed furnace heat on their latest satellite passes as of Nov 22, 2026, and none reads as paused. The running mills hold 14.2 Mt of the 14.2 Mt a year of capacity on the list.
Which steel mills in Austria are paused right now?
None, as of Nov 22, 2026.
Which steel mills in Austria are producing below normal?
None, as of Nov 22, 2026.
How many steel mills are there in Austria?
Global Energy Monitor lists 2 operating steel plants in Austria that make iron or crude steel, with 14.2 Mt a year of capacity. The largest is Voestalpine Stahl Linz (11 Mt a year).
Read from shortwave-infrared passes of Sentinel-2 and Landsat 8 and 9 (a pass is hot at 3 or more hot spots inside 3 km of the plant) and NASA VIIRS. Sources: Global Energy Monitor (CC BY 4.0), Copernicus Sentinel-2, USGS Landsat, NASA FIRMS. Method in full: How can you tell if a steel mill is running?
Know a mill we're missing? Check its address on the map.