Steel Mill Tracker › Steel mills by country
Which steel mills in Argentina are running?
4 of the 4 steel mills we track in Argentina showed furnace heat on their latest satellite passes as of Nov 22, 2026, and none reads as paused.
- Mills tracked
- 4
- Running
- 4
- Below their normal level
- 0
- Paused
- 0
- No reading
- 0
- Capacity at running mills
- 13.4 Mt
Every steel mill in Argentina
| Mill | Capacity a year | Status |
|---|---|---|
| Ternium Siderar San NicolásTernium Argentina SA | 7.5 Mt | Running |
| TenarisSiderca CampanaSiderca SAIC | 2.7 Mt | Running |
| ArcelorMittal Acindar Villa ConstituciónAcindar Industria Argentina de Aceros SA | 2.6 Mt | Running |
| Gerdau Sipar PérezSipar Aceros SA | 650 kt | Running |
Largest first. Status is the reading from the latest clear satellite passes; open a mill for its year of passes.
Common questions
Which steel mills in Argentina are running?
4 of the 4 steel mills we track in Argentina showed furnace heat on their latest satellite passes as of Nov 22, 2026, and none reads as paused. The running mills hold 13.4 Mt of the 13.4 Mt a year of capacity on the list.
Which steel mills in Argentina are paused right now?
None, as of Nov 22, 2026.
Which steel mills in Argentina are producing below normal?
None, as of Nov 22, 2026.
How many steel mills are there in Argentina?
Global Energy Monitor lists 4 operating steel plants in Argentina that make iron or crude steel, with 13.4 Mt a year of capacity. The largest is Ternium Siderar San Nicolás (7.5 Mt a year).
Read from shortwave-infrared passes of Sentinel-2 and Landsat 8 and 9 (a pass is hot at 3 or more hot spots inside 3 km of the plant) and NASA VIIRS. Sources: Global Energy Monitor (CC BY 4.0), Copernicus Sentinel-2, USGS Landsat, NASA FIRMS. Method in full: How can you tell if a steel mill is running?
Know a mill we're missing? Check its address on the map.